Passage Planning: The Four Stages and the OOW Oral

Audio Fastlane guide banner: Passage Planning: The Four Stages and the OOW Oral

Passage planning is the discipline of working out, on paper and on screen, how your vessel will get safely from one berth to the next before anyone slips the lines. It is a legal requirement under SOLAS, it is the backbone of every good bridge team, and it is one of the topics examiners return to again and again at the OOW and Master oral. This guide explains how passage planning works in practice and how to talk about it under questioning.

Key points

  • Passage planning has four stages under IMO Resolution A.893(21): appraisal, planning, execution and monitoring.
  • SOLAS V/34 puts the duty on the master: the voyage must be planned before proceeding to sea, using up-to-date charts and publications.
  • The plan covers the whole voyage, berth to berth, including pilotage areas, and the master approves it before departure.
  • Contingency plans are part of the plan itself, not an afterthought: know where you will go if you must abandon it.
  • Examiners test whether you can explain the stages in order and justify your own margins, so practise saying it aloud.

What the rules actually say

Regulation 34 of SOLAS Chapter V is titled "Safe navigation and avoidance of dangerous situations". It says that before proceeding to sea the master shall ensure the intended voyage has been planned using the appropriate nautical charts and publications for the area, taking into account the guidelines developed by the IMO. The voyage plan must identify a route that:

  • takes into account any relevant ships' routeing systems;
  • ensures sufficient sea room for the safe passage of the ship throughout the voyage;
  • anticipates all known navigational hazards and adverse weather conditions; and
  • takes into account the marine environmental protection measures that apply, and avoids, as far as possible, actions and activities that could damage the environment.

Those guidelines are IMO Resolution A.893(21), the Guidelines for Voyage Planning, adopted in November 1999. The STCW Code (section A-VIII/2, Part 2, Voyage planning) also requires the master to make sure the intended route is planned before each voyage. The resolution says the need for voyage and passage planning applies to all vessels. In the UK, MCA guidance on SOLAS Chapter V (MGN 610) confirms that regulation 34 applies to all vessels that go to sea, including small vessels and pleasure craft, and that for them the degree of planning will depend on the size of the vessel, its crew and the length of the voyage. It also notes that the plan can be checked during port State control inspections. Proportionate does not mean optional: even a short coastal hop needs a plan.

The four stages of passage planning

1. Appraisal

Appraisal means gathering every piece of information relevant to the voyage before you draw a single line. A.893(21) lists what to consider, including:

  • the condition of the ship: stability, equipment, operating limits, permissible draught at sea, in channels and in port, and manoeuvring data;
  • the cargo or load, if relevant, and how it is stowed and secured;
  • whether the crew is competent and sufficiently rested for the voyage;
  • up-to-date certificates and documents for ship, crew and passengers;
  • adequate, correct-scale charts, corrected with Notices to Mariners and checked against current radio navigational warnings;
  • Sailing Directions, Lists of Lights and lists of radio aids to navigation (in UK practice, the Admiralty List of Radio Signals);
  • tidal stream atlases and tide tables, climatological and weather information, routeing and reporting systems, VTS, expected traffic, pilotage and port information.

The output of appraisal is a general picture: where the dangers are, where it is safe to navigate, and where traffic schemes or environmental areas apply.

2. Planning

Planning turns that picture into a detailed plan for the whole voyage, berth to berth, including any pilotage waters. A.893(21) says the plan should include:

  • the intended track plotted on charts of appropriate scale, with true courses, hazards, routeing and reporting systems and environmentally sensitive areas marked;
  • safe speed, taking into account nearby hazards, the ship's manoeuvring characteristics and her draught against the water available;
  • speed changes along the route, for example for tidal restrictions, night-time restrictions, or squat and heel in turns;
  • the minimum under-keel clearance required in critical shallow areas;
  • positions where the engine status needs to change;
  • alteration (wheel-over) points that allow for the ship's turning circle at the planned speed and expected tidal effects;
  • the position-fixing method and its frequency, with primary and backup options, and which areas need the greatest accuracy;
  • contingency plans giving alternative action to place the ship in deep water or proceed to a port of refuge or safe anchorage if the plan has to be abandoned.

The details should be clearly marked and recorded on the charts and in a passage plan record or electronic system. Each plan, and every detail in it, should be approved by the master before the voyage begins.

3. Execution

Once the plan is final, and the departure and arrival times can be estimated with reasonable accuracy, the voyage is carried out according to it. A.893(21) says to weigh up factors such as the reliability of navigational equipment, ETAs at critical points for tide heights and streams, weather, passing hazards by day or night, and traffic density. The master should also consider whether conditions such as poor visibility at a point where a visual fix is essential make that leg unacceptably risky, and whether extra bridge or engine-room manning is needed at particular points.

4. Monitoring

Monitoring is where plans fail in the real world. A.893(21) says the plan should be available on the bridge at all times so watchkeepers can refer to it at once, that progress should be closely and continuously monitored, and that any change should be consistent with the guidelines and clearly marked and recorded.

🎧 Study on watch: Passage planning is easier to remember when you hear it explained like a watchkeeping handover. Our captain-written audio courses cover it as part of the MCA navigation syllabus. Get the app and start listening →

Practical tools of the trade

The terms below are not all spelled out in A.893(21), but they are standard bridge practice and examiners expect you to know them.

Term What it means in practice
No-go areas Areas where the depth you can count on (charted depth, plus height of tide only if you are timing the passage for it) is less than your draught plus squat and the required under-keel clearance, together with other areas you must not enter, such as wrecks or prohibited zones. Hatched on the paper chart, or shown by the safety contour and marked areas in ECDIS, so the whole watch can see them.
Safety margins and cross-track limits A safety margin is the extra sea room you keep between the vessel and the no-go areas, allowing for the ship's size and the accuracy of your position fixing. Cross-track limits are how far either side of the planned track you will let the vessel go before taking action; set them so that, even at the limit, you are still clear of the no-go areas with your margin intact. Narrow water means tight limits.
Abort points The last point at which you can safely abandon a manoeuvre, for example before entering a narrow channel, a harbour entrance with a shallow bar or a tidal gate. Beyond it you are committed, so plan what you will do if something goes wrong after that point too.
Tidal windows The times when there is enough water, or a suitable stream, to pass a critical point. Work out your ETA backwards from them.
Parallel indexing A radar technique: an index line is drawn parallel to the planned track at the planned passing distance from a radar-conspicuous fixed object. If the object's echo moves along the line, the ship is on track; if it drifts off, you can see at once how far and which way, giving a continuous cross-track check without plotting a fix.
Contingency plans Pre-planned alternatives: safe anchorage, deep water, a port of refuge, what to do on loss of position fixing or steering.

ECDIS checks for the passage plan

If you use ECDIS, the plan lives on the screen, so check it as you would a paper chart. Before sailing, make sure the charts are up to date and the permits and updates are applied. Work out the safety contour for this passage from your draught, squat and required under-keel clearance (whether you may also allow for height of tide is a company and master's decision), and remember that if the chart has no contour at that depth, ECDIS uses the next deeper one, so check which contour it has actually chosen. Set the safety depth so that dangerous spot soundings are highlighted, and set the cross-track and other alarm values. Run the automatic route check, then also check the whole route visually at the most suitable (largest) scale, because the automatic check can miss hazards. Know which alarms you rely on and what each one means. Have a backup arrangement ready for ECDIS failure, and make sure the whole bridge team has seen the plan, not just the officer who drew it up. See our guide to the ECDIS and related courses for the training side.

How examiners test passage planning at the OOW oral

Passage planning sits in the navigation part of the MCA oral syllabus. You will not be asked to recite A.893(21) word for word, but you will be asked to explain the process and justify your choices. Expect questions such as:

  • What are the four stages of passage planning, and what happens in each?
  • What does SOLAS V/34 require, and who is responsible?
  • What would you check at the appraisal stage?
  • How do you decide on your cross-track margins and your under-keel clearance?
  • What is your contingency plan if visibility drops or a position-fixing system fails?
  • How do you monitor the plan on watch and what do you do if you deviate from it?

Answer in order, give a real example from a vessel you know, and always say who approves the plan (the master) and when (before departure). If you are preparing for the exam, our guides to the OOW oral exam and common oral questions show how to structure answers.

Common mistakes

  • Planning only the open-sea leg and leaving the approaches and berthing to "see how it goes".
  • Using uncorrected charts or out-of-date publications.
  • Setting an ECDIS safety contour from habit rather than working it out for this passage from draught, squat and under-keel clearance.
  • Relying on the ECDIS automatic route check without a visual check of the route at a suitable scale.
  • Drawing up a plan the master has not seen or signed.
  • Leaving the plan in a drawer: it must be to hand on the bridge and followed.
  • Failing to brief the watch about abort points and contingencies.

Frequently asked questions

What is passage planning?

Passage planning is the process of preparing a voyage from berth to berth, covering the route, safe speeds, safety margins, tides, weather, position fixing and contingencies, then carrying it out and monitoring it. The IMO sets it out in Resolution A.893(21).

What are the four stages of passage planning?

Appraisal, planning, execution and monitoring. Appraisal gathers information, planning produces the detailed berth-to-berth plan, execution sails it, and monitoring checks progress and records any change.

Is passage planning a legal requirement?

Yes. SOLAS Chapter V Regulation 34 requires the master to ensure the voyage is planned before proceeding to sea. In the UK it applies to all vessels that go to sea. MCA guidance (MGN 610) says that for small vessels and pleasure craft the degree of planning depends on the size of the vessel, its crew and the length of the voyage, but a plan is still expected.

Who approves the passage plan?

The master. A.893(21) says each plan, and its details, should be approved by the master before the voyage begins.

What is the difference between a no-go area and a safety margin?

A no-go area is water you will not enter, usually because there is not enough depth for your draught and under-keel clearance. A safety margin is the extra distance you keep between the vessel and those areas. The cross-track limit, how far off the planned track you will let the vessel go before correcting, is set so that you never eat into that margin.

What is a contingency plan in passage planning?

It is a set of pre-planned alternative actions if you have to abandon the plan: for example, going to deep water, a safe anchorage or a port of refuge. A.893(21) lists it as part of the detailed plan.

Related guides

Learn passage planning by ear

Captain-written audio, built around the MCA syllabus, for the watch and the commute.

Get the Audio Fastlane app

Revise this by audio

Audio Fastlane turns the syllabus for your next ticket or certificate into audiobooks, with read-along text, visual recaps and exam-style questions. Six titles are free for good, including two COLREGs audiobooks, with no account needed. On iPhone and Android.

App Store (iPhone) Google Play (Android) See every title